WP 165 Restoration Blog

Updates on the restoration of Western Pacific 0-6-0 number 165 at the Western Pacific Railroad Museum at Portola, California.

Thursday, September 29, 2016

Tender Sandblasting & Fall Update

Our industrious contingent was ultimately successful in getting the majority of the tender's water cistern sandblasted and partially painted prior to lifting it back onto the frame. This from sandblasting coordinator Bob Sims:

I would like to give super thanks to all the depraved souls who "chipped in" (or off) on the tender prep work, including Ken, Burr, Dave A., Erik, City of Portola, and especially Kirk and Charlie


Kirk and Dave work at needle chipping in the coal space prior to sandblasting.

Thanks to the City of  Portola for the loan of the air compressor!

Dick tends to the hose while Roger sprays the bottom of the cistern black.

Roger spent several days getting the WP derrick running so we could use it for the lift, but due to circumstances "beyond our control" we were not allowed to use it. Consequently, we brought in a hydraulic crane from Reno at additional cost to the Museum.

Steve brought back a machined steam dome lid ready to go up when needed. 

Roger and Erin continued working on the cab sheet metal, we now have an enclosed well ready for boards. This project is coming along nicely. Roger also "rescued" an air motor suitable for driving a tube roller from an old oil tank next to the Edenwold. After cleaning it up it ran as good as new and is ready for action. Good going Roger!


Channing spent some time cleaning up holes in the front tube sheet.

Steve bolts up the air brake distributing valve while Chris admires his work.

Eric and Channing spent most of the weekend annealing tube ends in preparation for rolling them in, hopefully soon. This is a necessary albeit monotonous task and we thank them for taking it on. They should be up sometime before winter to finish the up the rest of the 2" diameter tubes.

Severn, Scott and Dave R. spent their time threading the remaining rigid stays, 13 of them, and fitting them into the side sheet of the firebox where we had previously welded in a patch. They stuck with it, got it done, and they are now ready to be driven.


Master machinist Severn hard at work turning stays.

Severn works while Scott looks on.

Fresh stays ready for trimming & driving.

Cistern and frame reunited at last

It is our hope that sometime before the Spring work session Roger will get back up and finish painting the tender and cab. It will be nice to have the engine start looking black and shiny again. After paint, tubes can go in and we can continue the march toward a successful hydrostatic test on the boiler. Thanks again to everyone who helped us make forward progress this year! A special thanks to Bob and James for continuing to be very generous with their monetary donations! - JCA 


Master blaster Ken Chapin.


Friday, July 29, 2016

Tender Sandblasting Work Session Coming Up.

Looks like the first organized work sessions will start Fri + Sat the 12th+13th.
These will be evening into overnight shifts so the museum is closed, winds are calm, and COOL
We plan to start getting setup shortly after 5pm, if not still hot, and rotating a 2 man minimum crew every few hours depending on when people need a break. If things are going well, we'll push all the way to ~7am, then clean-up, and have breakfast at Sharon's au gratis.

Ken will train people in sand blasting, spraying primer, and painting all surfaces that will be inaccessible after the tanks are re-united with the frame. We would rather not have people getting trained and then split after a few hours unless they can support other evenings.

The planned Fri/Sat evening dates will continue each weekend as required up to the main work session starting Sep. 8th. That's 4 weekends max - Aug 12+13, 19+20, 26+27, and Sep 2+3. If work is going fast, we could drop the 26 and/or 27. In any case, the last weekend Sep 2+3 is targeted for having all the exposed surfaces sand blasted and primed. Weekday sessions are anticipated if we have a minimum crew.

Please have anyone who can support a particular date contact Ken atalcobackshop@gmx.com
or his cell at 208-625-1313 or me at 661-805-9869 or eb2727@att.net

Thanks, Bob

Monday, April 18, 2016

Spring 2016 Workweek Report

Another spring session has come to a close, and I am happy to report that a whole lot of items were crossed off the punch list this time. So many so that I will have to make up a new list!

Sunday morning, April 3rd, I left our new digs in Pine Grove and headed over Carson Pass. On the way to the WPRM I stopped into the Nevada State Railroad Museum in Carson City and spent about an hour catching up with John Walker, the former manager at Portola. John now manages the gift shop and concessions for the NSRM. After a bit of "reminiscing" I went over to check out the recently restored Virginia & Truckee McKeen motor car. A stunning job by Chris Dewitt and his crew.

After moving into the Pullman car for the week, I was joined by Roger Stabler, we were both happy to see that the engine was now sitting over the pit, and the tender frame was adjacent to the wood working bay. Thanks to Steve and David for getting the switching done for us!

Other tasks completed during the work week included Hank and Roger fabricating a new valve rod for the power reverse, and getting it in working order with the valve gear operating for the first time in many decades; also Roger finished up all of the problem flexible staybolt caps leaving just the 24 or so up on the roof sheet to buttoned up, once the new stays are installed.

The team of Channing, Roger, Hank and Charlie set the remaining six rivets in the firebox knuckle patch and turret drypipe bracket. These have been avoided up until now due to their awkward locations, but the guys figured out how to back them up using levers and brute force.

A big visual change to the tender came with the fitting up of the deck boards we acquired in the fall from the Amador Sawmill Association. Charlie and Kirk have been tending to the pile of lumber, turning them every few weeks so they would dry evenly all winter, and thanks to them the boards stayed straight. Bob Sims led the effort to cut them to length, and countersink the locations where they had to sit on rivets, bolts, etc. Charlie, Lynn, Steve, Dave and Bil worked on getting them bolted down, as well as applications linseed oil to work as a preservative. Bil took it upon himself to make up the new rear footboards using some of the leftovers, and it looks great!

New footboard on the rear of the tender frame.
Dick Coudin cleaned up several components, including the handrails at the cab, and the power reverse reach-rod. Those and the handrails down both sides of the boiler have been re-applied, which adds a bit more safety for working up there. Many people remarked on how much the 165 is beginning to look like a locomotive again.

Roger welds one of the cleanouts from the coal days onto the smokebox.
Erik, our stalwart volunteer and captain of the Western Pacific tug "Hercules" suffered a bit of a hand injury right before coming up with Channing and Severn. To his credit he pushed through and was able to do a few things, like driving the forklift and plumbing up the power reverse. We hope his injury is well on the way to healing and we thank him for going above and beyond for us! Severn and Dave Roth brought up a pipe threading machine for the shop which will prove to be beyond useful to us. Thanks again GGRM!

New power reverse valve rod fabricated by Roger and Hank.
Severn, David and yours truly spent a good amount of time standing at the lathes making studs and staybolts. This process will go well into the summer. Thanks go to Duane for wiring the 13" lathe up so it could be used. Thanks also go to David for getting the machine shop in order in time for our work session.

A veritable milestone was achieved on Thursday when Channing, Erik, Ken and Nancy began cutting the 2" tubes to length and setting them in the boiler. All in all they got almost 100 in! These will not be rolled in until later this year as we don't want the start the 15 year clock running until we are further along with the tender and a few other things.

On another front, Dave Varley delivered the completed FRA Form 4 to us, and it was signed off. Now to mail it off to Washington D.C. for review by the FRA. Dave worked like a dog on this document, which is quite thick, and the culmination of many, many hours of measuring and calculation on the part of many, including Dave. Now he can get back to moving his museum's collection over to Santa Cruz.

The valve covers were removed and inspected by Hank.

The tender deck being fitted up.

Ken placing the first 2' tube back into the boiler!
All in all another great effort from the "Steam Team".  Our next big session will be in the fall, but there are lots of projects to be done before then, such as sandblasting the tender cisterns, turning stays, machining a new dome lid, and myriad other things.  Brake valves have been rebuilt and tested.  If we are allowed to continue at this pace we should be in steam by 2018. Fingers crossed...

More updates will come as some of these tasks get underway. Have a great spring season! - JCA